Interconnection of hydro power plant through 20 kV distributed line to improve electrical power supply in Dieng Central Java

Mochammad Facta, Hermawan

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Hydro power plant is possible to be present and has interconnection to distribution line. The presence of such power plant is expected to supply additional power and overcome voltage drop at load side. In this paper, several experimental works based on simulation and primary data from field measurement are presented to show the performance of interconnection of hydro power plant through 20 kV distribution line to improve electrical power supply in Dieng - Central Java. Several requirements were observe and investigated by conducting simulation experiment. Several analyses such as Load flow, short circuit and stability were performed. As the results, the presence of hydro power plant has given positive impact to the profile of voltage in 20 kV distribution system. All power flows to the load properly and no reverse power back to the power plant or substation.

Original languageEnglish
Title of host publicationICITACEE 2015 - 2nd International Conference on Information Technology, Computer, and Electrical Engineering
Subtitle of host publicationGreen Technology Strengthening in Information Technology, Electrical and Computer Engineering Implementation, Proceedings
EditorsR. Rizal Isnanto, Mochammad Facta, Eko Didik Widianto, Dania Eridani
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages363-366
Number of pages4
ISBN (Electronic)9781479998616
DOIs
Publication statusPublished - 21 Mar 2016
Event2nd International Conference on Information Technology, Computer, and Electrical Engineering, ICITACEE 2015 - Semarang, Indonesia
Duration: 16 Oct 201518 Oct 2015

Publication series

NameICITACEE 2015 - 2nd International Conference on Information Technology, Computer, and Electrical Engineering: Green Technology Strengthening in Information Technology, Electrical and Computer Engineering Implementation, Proceedings

Conference

Conference2nd International Conference on Information Technology, Computer, and Electrical Engineering, ICITACEE 2015
Country/TerritoryIndonesia
CitySemarang
Period16/10/1518/10/15

Keywords

  • distribution system
  • hydro power plant
  • load flow
  • shirt circuit
  • stability

Fingerprint

Dive into the research topics of 'Interconnection of hydro power plant through 20 kV distributed line to improve electrical power supply in Dieng Central Java'. Together they form a unique fingerprint.

Cite this